1/5

Concrete Structures

Conpavers works with and installs concrete structures from 500kg to 10tonnes. Work done on the Picton Rail Bridge required Conpavers to handle the precast, transport and lifting of the structures into place before setting them. All the groundwork was prepared before hand and then the test, when the first of the many trains trunded over the new pillars of the bridge. Upon complettion of this project there was no looking back to bigger and more complicated projects that ever imagined.

sales@conpavers.co.nz     /    Call Us Now: ​​0800 14 74 33

Conpavers Location

Copyright © CONPAVERS. 2017. All Rights Reserved - Site by BDM

  • w-facebook
  • White Instagram Icon
  • White LinkedIn Icon